2018

Extensive underground works are carried out to find the source of the subsidence. It is found that the addition of a retaining wall during the 1986 construction of the Ipswich Mall led to draining issues and soil erosion.

The building’s original name, the Commonwealth Hotel, is reinstated.

Back to top button
X
X